Have you ever wandered how long it will take to clean random architecture

Let’s begin with the Great Wall of China

The Great Wall of China was built as a military defensive line to defend the invasions from some northern nomadic nations.

The total length of all sections of the Great Wall of China ever built adds up to about 21,196 kilometres (13,171 miles) which means it would take 15 mins to drive from one end to the other and if you were ever feeling adventurous and wanted to walk it would take you 18 months.

How long will it take to clean The Great Wall of China

If we were to clean The Great Wall of China, it would take around 100 people and would approximately take 52 years (FIGURES NOT EXACT)

Let’s have a look at the Shard in London.

The Shard, also referred to as the Shard London Bridge and formerly London Bridge Tower, is a 72-storey skyscraper, designed by the Italian architect Renzo Piano, in Southwark, London,

It has approximately 11,000 glass panels which is the equivalent of eight football pitches and as you can imagine it would take days and days to clean.

So how long will it take to clean The Shard??

It would take a team of cleaners around three months to complete the entire glass façade. Once they’ve finished, they start all over again so that the iconic London skyscraper gets four cleans a year.

Let’s look at The Big Ben

Big Ben is the nickname for the Great Bell of the Great Clock of Westminster at the north end of the Palace of Westminster in London, England and the name is frequently extended to refer also to the clock and the clock tower.

The Houses of Parliament clock (nicknamed Big Ben) was built in 1859. Each clock face is made up of 312 pieces of opal glass, which means that when it’s looked at it must be treated carefully.

How long will it take to clean Big Ben??

It takes a week to complete the cleaning so long as the weather stays fine.

Finally, we can look at Office Cleaning something Ideal specialise in

When cleaning an office space, the time it takes to clean the space can really depends on the type of office it is.

For example, a 3-story building could take a couple of hours whereas a building of just 2 offices could take around 30-60 mins.

How long will it take to clean a building of offices??

Office cleaning can take anywhere from 30 minutes to a few hours depending on the size and complexity of the job. If the cleaning, you are wanting is Commercial usually the cleaners will provide an estimate of the time and the price before starting their work.

Ram Karavadra

Author Ram Karavadra

More posts by Ram Karavadra

Leave a Reply